PetroChina achieves record-high LNG regasification capacity.

date
06/12/2025
On December 4th, a ship carrying 150,000 cubic meters of liquefied natural gas from Papua New Guinea docked at the Jiangsu Rudong LNG receiving terminal in China. The operator in the control room closely monitored the real-time data and safety status of key operations such as unloading, storage, and gasification for outbound transmission through the intelligent monitoring system. It was reported that this was the 818th ship unloaded at the CNPC Jiangsu LNG receiving terminal. Since the start of winter supply, CNPC's LNG receiving terminal has unloaded 20 LNG ships, with the highest daily gasification output reaching 84 million cubic meters, setting a new record for gasification capacity.