Leshan Power: Jianwei power grid load exceeds 290,000 kilowatts, reaching a new high.

date
20/07/2026
On the evening of July 16th, the highest load of 290,000 kilowatts was reached by the Qianwei power grid, breaking the historical record. Leshan Power Qianwei Company quickly initiated a peak load and summer-power protection plan, and the overall operation of the power grid is currently stable.