The Hangde City Regional Railway's entire line is officially connected.
On May 18th, with the successful connection of the last rail section of the Hangzhou-Deqing urban railway II section constructed by CR11, the entire line of the Hangde urban railway has been completed, laying a solid foundation for the on-time opening and operation of the line. The Hangde urban railway is the first urban railway connecting Hangzhou and Huzhou, and is also a key transportation project in Zhejiang Province. The total length of the line is 25.6 kilometers, with a total of 9 stations. After opening, it will be connected to and operated with Hangzhou Metro Line 10, forming a "one-hour urban circle" between Hangzhou and Deqing, greatly improving the transportation convenience between the two places.
Latest

