The Chengdu-Chongqing Middle Line high-speed railway's Jialing River super large bridge was connected today.

date
31/03/2026
Sina Finance News on March 31st, it was learned from China Railway Chengdu Bureau Group that around 10 o'clock on March 31st, with the completion of the last welded joint of the steel box beam section, the main control project of the new Chengdu-Chongqing high-speed railway on the Chengdu-Chongqing Central Line, the Jinkou Jialing River Extra Large Bridge, was successfully connected, marking the completion of all the bridge sections on the Chengdu-Chongqing Central Line high-speed railway, laying a solid foundation for the on-time opening of the entire line. The Jinkou Jialing River Extra Large Bridge is one of the key control projects on the difficult sections of the Chengdu-Chongqing Central Line, with a total length of 1294.3 meters, it is the longest double-tower cable-stayed bridge on the entire Chengdu-Chongqing Central Line.