The Xiaolangdi Reservoir will increase the discharge flow from today to ensure spring irrigation.
According to the Yellow River Water Conservancy Commission of the Ministry of Water Resources, the winter wheat in the Yellow River Basin is gradually entering the greening period, and the demand for irrigation water in spring is gradually increasing. Starting today, the Yellow River Water Conservancy Commission of the Ministry of Water Resources will increase the discharge flow of the Xiaolangdi Reservoir to 1350 cubic meters per second in preparation for the upcoming peak demand for spring irrigation water.
Latest
22 m ago

