Qingdao Port: It plans to invest in the construction of the first phase of the Dongjiakou Port Area Langya Taiwan Operation Area East Container Terminal in Qingdao Port, with an estimated investment of RMB 9.097 billion.
Qingdao Port announcement, planning to invest in the construction of the first phase of the container terminal at the Dongjiakou Port Area Langya Taiwan Operation Zone in Qingdao Port, with an estimated investment of 9.097 billion RMB. On the east coast of the Langya Taiwan in the Dongjiakou Port Area, at the north end of General Purpose Terminal #7 berth, 3 specialized container berths will be built, including one 70,000-ton berth, one 100,000-ton berth, and one 150,000-ton berth. The length of the terminal shoreline is 1,167 meters, with a total area of the terminal yard of 125.97 hectares, and a designed annual processing capacity of 3.2 million TEUs. The terminal and yard will be constructed to full automation standards. The project construction period is approximately 4 years, with completion expected in 2029.
Latest

