DRAGON MINING (01712): The drilling activity in Uunimaki has achieved high-quality results.

date
12:21 06/03/2026
avatar
GMT Eight
Dragon Resources (01712) announced that it has obtained the final assay results from the latest diamond core drilling program at the Uunimki gold project in southern Finland. The results include several noteworthy intervals of near-surface mineralization, including higher-grade narrow intervals.
DRAGON MINING (01712) announced that it has received the final assay results for the diamond core drilling program at the Uunimki gold project in southern Finland. The program targeted several notable intervals of near-surface mineralization, including higher-grade narrow intervals: - 4.30 meters at 9.23 grams per ton of gold at 15.50 meters depth in hole HU/UUN-3 - 4.30 meters at 10.39 grams per ton of gold at 61.55 meters depth in hole HU/UUN-12 - 3.20 meters at 15.80 grams per ton of gold at 83.10 meters depth in hole HU/UUN-22 - 2.50 meters at 39.68 grams per ton of gold at 39.35 meters depth in hole HU/UUN-23 The Uunimki gold project is located 80 kilometers southwest of Tampere in the Satakunta region of Finland, approximately 15 kilometers southwest of the company's operating Jokisivu gold mine, within trucking distance to the company's Vammala plant. The project forms part of DRAGON MINING's wholly-owned Vammala production center in southern Finland. The company holds a total of 89.22 hectares at Uunimki, covering a single exploration permit for the Uunimki gold deposit. The area is completely surrounded by a granted conservation area of 1,269.09 hectares. DRAGON MINING completed its first drilling program at Uunimki in 2025, consisting of 21 drill holes totaling 2,369.45 meters. The program targeted near-surface mineralization with vertical depths of approximately 120 meters, spaced at intervals of 20 meters and 40 meters. The company is currently preparing for initial phase laboratory-scale metallurgical testing to determine the suitability of the Uunimki mineralization for processing at the Vammala plant. The company also plans to complete further drilling in 2026, followed by a preliminary mineral resource estimation by the end of 2026.