The Baolan Railway in Inner Mongolia has resumed operation after being interrupted due to water damage.

date
20/07/2025
It was learned from the China Railway Hohhot Group Corporation Limited that at 7:28 pm on July 19th, the 10389 freight train departed from Hangjin Banner Station on the Baolan Railway and smoothly passed through the previously water-damaged section that had interrupted train operations for about 24 hours. The section between Hangjin Banner Station and Jianguo Station on the Baolan Railway has been successfully reopened, and the operation order of passenger and freight trains passing through this section will gradually be restored.